Home Power Plants
Электростанции

GAS TURBINE
26 MW - GENERAL ELECTRIC FRAME 5

1993 - put into operation
102,850 h operating time (approx.)
389 starts

• Capacity: 26 MW
• Operates on natural gas or heating oil (EL)
• Complete unit (gas turbine, transmission, generator mounted on single frame)

Dimensions:

• Length 23.3 m
• Width 5.0 m
• Height 5.4 m


Condition:

very good, in operation until 01/2008, always well serviced


Location:

Europe


26 MW — GENERAL ELECTRIC FRAME 5
ZOOM

powered by ventigo.com