|
GAS TURBINE
26 MW - GENERAL ELECTRIC FRAME 5
1993 - put into operation
102,850 h operating time (approx.)
389 starts
• Capacity: 26 MW
• Operates on natural gas or heating oil (EL)
• Complete unit (gas turbine, transmission, generator mounted
on single frame)
|