32 MW STEAM TURBINE POWER PLANT

BOILER plant:
Capacity
manufactured
No. of drums
Support
Type of boiler
Working pressure
steam temperature
Furnace grate area
Type of firing
Heating Surface
Boiler
Furnace
Super heater
Economizer
Air heater
Fans
FD fan
SA fan

Feed water temperature
Control Panel board
how long stopped
Boiler modernization
150 TPH
1973
1
Top Supported
Watertube and membrane type furnace
9,4 Mpa
525 C
no grate
combined oil and natural gas fired
3,203 m2 ( Pressure Parts )
1,271 m2
809 m2
345 m2
788 m2
3,831 m2

450 kW
160 kW

190 C
yes
in operational condition
1996 - 1998


Turbine Plant:
Turbine generator condensing turbine with controlled extraction.
Nominal output
Year of manufacture
Major overhauls
Shut down
Operating hours
32,000 kW
1972
2006
12/2008
160,000

The equipment is in good condition.
It can be assumed that the equipment is fit enough to be operated for further 250,000 hours.
Assumed that regular maintenance of the equipment will be carried out.


Turbine: Bergman Borsig (Alstom)
Model
Rpm
Live steam
Extraction controlled
Condensing
EK 106/25/17
3,000
89 bar (max. 104 bar)
4,5 bar
0,041 bar
Maximum possible steam flow : Guarantee 154 t/h; max 175t/h
Controlled bleed point with non-return valve:
Steam flow (rate) (80t/h= 0,7 bar) (110t/h="1.25" bar) (145t/h="2,5" bar)


Condenser:
Quantity of cooling water
cooling surface
4,500 m/3
1,600 m/2


Generator:
Active Power
Apparent Power
Voltage
Cos.phi
Fequency
Cooling
32 MW
40 MVA
10,5 KV+-5%
0,8
50 Hz
AIR


Condition: Very good and very well mantained
Availability: immediately